English 简体中文

中国(上海)非开挖技术与管线工程国际研讨会
ASCE International Pipelines and Trenchless Technology Conference 2009

Co-Sponsored By

American Society of Civil Engineers (ASCE) - Pipeline Division China-U.S. Joint Center for Trenchless R&D (CTRD) China-U.S. Joint Center for Trenchless R&D (CTRD)  title=

Hosted By

China-U.S. Joint Center for Trenchless R&D (CTRD) Center for Underground Infrastructure Research and Education (CUIRE)

Workshops

The Center for Underground Infrastructure Research & Education (CUIRE) and China-U.S. Joint Center for Trenchless R&D (CTRD) will organize the following parallel three workshops. The presenter on workshops will be CUIRE or CTRD Board Members and Friends with many years of experience in the related areas.

Advance HDD Workshop for Engineers and Inspectors

Sunday, October 19, 2009, Shanghai
8:00 – 11:30 AM and 1:30 – 5:00 PM
This workshop presents an overview of different new installation technologies, planning, design, and construction concepts, contracts, specifications and inspection issues, application assessment, geotechnical and site investigations, new equipment & methods, case studies, bore planning and layout, pipe load calculations, safety issues, steering and accuracy, gravity pipe applications, different pipe materials, site and geotechnical investigation requirements, drilling fluids, tracking and locating, and new technologies.

Pipe Jacking/Microtunneling Workshop

Sunday, October 18, 2009, Shanghai
8:00 – 11:30 AM and 1:30 – 5:00 PM

This workshop presents an overview of different new installation technologies, planning, design, and construction concepts, contracts, specifications and inspection issues, application assessment, geotechnical and site investigations, new equipment & methods, case studies, safety & productivity issues, application assessment, shaft construction methods, jacking load calculations, pipe materials, new technologies, and construction considerations.

Pipeline Renewal and Repair Workshop

Sunday, October 19, 2009, Shanghai
8:00 – 11:30 AM and 1:30 – 5:00 PM

This workshop presents an overview of different pipeline conditions assessment, renewal technologies (Including CIPP, Sliplining, Pipe bursting, etc. ), planning, design, and construction concepts, contracts, specifications and inspection issues, geotechnical and site investigations, new equipment & methods, case studies, safety & productivity issues, application assessment, shaft construction methods, jacking load calculations, pipe materials, new technologies, and construction considerations.

Registration Fee: The cost for each workshop is RMB 800.

Focus

Presentation Program(Final)new
Moderator Guidelinesnew
Workshop Registration Formnew
Conference Registration Formnew
Information Form
Speaker Presentation Guidelines.pdf
Poster Presentation Guidelines.pdf

Click here to register.

Review Result Check Here.

Paper Reviewing Progress:

267/267(100.00 %)
We received 347 submissions, and accepted 225 papers..

Paper Format Guideline & Sample.

Exhibits(Updating...)

Files Download

宣传小册子下载 ICPTT Brochure
Rayfile Local
Japanese Version
Venue Layout Plan for Conference & Exhibition
PPT Pdf File

Media Partners

中国非开挖工程技术网
http://Www.Trenchless.Cn